The crushed ore is shipped to the Boliden concentrator at the Garpenberg zincleadsilver operation, approximately 110 km from the mine. In 2009 Lovisa produced 32,000 mt of ore. Both and Lovisagruvan have been pleased with the outcomes of the trial operation.